AMR

Protect & Maximize Your Pavement Investment

Expert Seal‑Coating Solutions for Driveways, Parking Lots & Roadways
At AMR Paving and Masonry, we specialize in premium seal coating services for residential and commercial properties. From driveways to parking lots and private roads, we handle it all with precision and care. Our skilled team uses commercial-grade materials and the latest tools to ensure smooth, durable, and long-lasting results.

Ground with Strips

Why Sealcoating Matters

Asphalt surfaces naturally wear down because of sun exposure, oil leaks, road salt, and chemical spills. If untreated, this leads to cracks and fading. Sealcoating creates a strong shield that:

  • Blocks moisture and prevents oxidation
  • Guards against fuel, oil, and chemical damage
  • Restores the appearance of paved areas
  • Extends surface life up to three times
  • Enhances property value and curb appeal

Our Services

Asphalt
Sealcoating

Know More…

Parking Lot Striping & Pavement Marking

Asphalt Crack
Repair

Paving
Services

Traffic Signs, Stencils & Bumper Blocks

Parking Lot
Maintenance

Road
Markings

Masonry
Services

Our Projects

Our designer already made a lot of beautiful prototipe of rooms that inspire you

Testimonials

Slide 01
Rating stars

"Excellent work and great communication from start to finish. They paved our commercial parking lot on time and within budget. The quality is outstanding and the striping looks sharp. Highly recommended!"

– Carlos N.
Slide 02
Rating stars

"Fantastic job on our driveway—quick, clean, and professional!"

– Rachel M.
Slide 03
Rating stars

"They resurfaced our parking lot perfectly. Great value!"

– Mike R.
Slide 04
Rating stars

"I had my driveway done and couldn’t be happier with the work will definitely use Jon again!!! Thanks for a great job!!!"

– Linda Vazquez

Our Process

  • Site Inspection & Surface Cleaning
    Each section of the pavement is carefully evaluated, and all loose dirt, gravel, and unwanted vegetation are cleared to ensure strong sealant adhesion.
  • Crack Filling & Patch Work
    Cracks and damaged areas are filled or repaired to create a smooth surface before sealing.
  • Precision Sealcoat Application
    A smooth, non-slip layer is applied using professional equipment to provide long-lasting protection.
  • Curing & Quality Check
    After the sealcoat dries fully, a final walkthrough is done to ensure everything is clean, smooth, and sealed perfectly.

Why Choose Us?

  • Skilled Team: Skilled in asphalt care with more than two decades of proven results across residential and commercial projects.
  • Top-Quality Products: We use only the best materials for maximum longevity.
  • Easy Scheduling:  Appointments scheduled at your convenience.
  • No-Hidden Costs: Honest rates with no additional or surprise charges.
strip-road-in-between-trees

WE ARE THE BEST IN BUSINESS

Frequently Asked Questions

What services do you offer?

We specialize in sealcoating and asphalt maintenance for residential and commercial properties. Our services include sealcoating driveways and parking lots, filling hot cracks, and striping lines. We also do asphalt patchwork and small extensions to keep your pavement in good condition. Also, we use high-quality materials to ensure long-lasting results. 

We proudly serve Wappingers Falls, NY, and surrounding areas, including Fishkill, Beacon, Poughkeepsie, Hopewell Junction, East Fishkill, Myers Corner, Hughsonville, Brinckerhoff, New Hamburg, Chelsea, and parts of Lagrangeville and Arlington. We also cover nearby neighborhoods like Spackenkill, New Hackensack, and Red Oaks Mill.

Whether you’re a homeowner or business owner, we’re here to handle your sealcoating and asphalt maintenance needs locally and reliably.

A small residential driveway can usually be paved in a single day, followed by another 24 to 48 hours of curing before regular vehicle traffic. Medium-sized parking lots often take 1 to 2 days for paving and striping, plus the same curing time. Large commercial lots or projects needing extra grading and drainage might take 3 days or more. Some factors that influence the exact timeline include weather, site preparation, and the number of crews. 

You should wait for about 24 to 48 hours before driving on fresh asphalt. If it’s hot outside or the layer is thick, giving it an extra day is a good idea. Heavier vehicles such as trucks, trailers, or RVs should stay off for around 5 to 7 days to avoid leaving marks. For the first week, try to avoid sharp turns, spinning your wheels, or parking in the same spot too long.

Get in touch